Full re-engineering, design, delivery, installation and commissioning of an enlargement of the steam system. Because of the limited space, the whole system is designed and installed in an area of 50 sq.m. in the production premises. As a result the production productivity is enhanced by 100%.
Balkanika Energy Plc. is a company established with aim of complete realization of investment projects in the production and utilization of energy from renewable, conventional and alternative energy sources, and protection of the environment through sustainable systems for waste recovery.